How to build you trailers?

Build your own trailer following these easy steps

Choose your model from our product

​1.Before you choose, answer these questions :

 

  • What is my business about, bbq,chuross,hotdog, ice cream,coffee,fruits,flower etc

  • How many people will work inside the trailer?

  • What kind of equipment do I need, electrical or gas based?

  • Do I need a cooking equipment?
    Choose your appliances from our EQUIPMENT 

  • Do I need fridge or freezer?
    Choose appliances from our EQUIPMENT 

  • What is my budget?
    If you have your own appliances it's not a problem! Just provide us with their measurements L x W x H (cm) or inch

    2.Chose your product after you read above questions :
    Select the products you are interested in on our website, please provide pictures, sizes, colors, etc.
    Tell us the list of equipment you need, and if not, choose the standard configuration.
    About the installation location of the equipment: the kitchen equipment is installed in the back counter, the refrigeration equipment or other small equipment is installed in the front counter. The position of the equipment, the sink and the socket can be adjusted according to the customer's needs.

    3.Any special requirement for your trailer? 
    Generator box, Gas box, LED Decoration, logo Design etc

    4.if transport arrangement is required
    Our products are currently shipped by sea. Shipping costs are different for each country's port. Please provide the destination port, we will quote according to the product size

    Ready to put all together?
    Now that you have sorted all previous questions, we can start with your project :


    1.Send us an email to info@huanmaitech.com with all your inquiries and ideasWe will put a floor plan and a full quote for youIf you are happy with our quote
    2.we will go ahead and make a full  views drawings of your trailer
    3.We require a 50% down payment Lead time is about 3~4 weeks for production and transit time 3~5weeks (we will keep you posted with some pics and inspection feedback)
    4.Allow 2 to 3 business days for electrical fitting (and/or gas)
    5.Let us know if transport arrangement is required
    6.if not, your trailer will be ready for pick up​

Message Us